Genesee Valley Pool reopens following $2.2 million renovation project
[anvplayer video=”5128783″ station=”998131″]
ROCHESTER, N.Y. (WHEC) — The pool at the Genesee Valley Aquatics Center opened on Monday after a $2.2 million renovation project.
We’ve been reporting on the progress of the renovations, which were scheduled to be complete by late June. The pool has been closed since September 2020. The renovations include a new pool surface, deck, fence, lifeguard chairs, starting blocks, slide, lighting, and an upgraded plaza entrance.
The reopening was at 1 p.m. The pool remains open Monday through Friday from 1 to 7:30 p.m.
Open Swim sessions will take place from 1 to 4:45 p.m. and 6 to 7:30 p.m. Lap Swim takes place from 5 to 6 p.m. The pool will be open through September 5, 2022. Admission to the pool is free.